Aeroporto di Firenze

Date

Client

Size

Value

Stages

Sustainability

2021-2025

Toscana Aeroporto

45,000 sm

200m Design & Build with Multiplex

Design Lead Stages 1-3, Adviser Stages 4-6

LEED Gold Targeted

  • Worked on enclosure package between commitments to other RVA schemes

  • Credible contributions to value-engineering including swapping ETFE for glass

  • Initiated exercise on high-tech/low carbon concrete - credible but overruled

  • Proposed seismic solution for technically challenging roof structure